Production Readiness QA
Every production answers YES before the final film is approved. Evidence required.
Not ready: 264 P0 blockers must be resolved
0 of 320 questions answered YES · 320 not yet checked · 0 gaps identified
Progress
0%
Character Lock
—
All characters locked, referenced, and consistent
World Continuity
—
World Bible alignment across all frames
Production Completeness
—
All stages complete, package verified
Final Approval
—
Tai has approved the final package
0
/ 320
0
/ 320
0
/ 320
320
/ 320
264
/ 264
Is this production connected to one clearly identified LinkedIn post?
Is the approved post version locked as the source of truth?
Can the Studio distinguish the original post, Studio revision, and approved version?
Is the central argument explicitly stated?
Is the intended reader shift defined?
Are the claims the film must protect documented?
Does the film support the post without changing its meaning?
Does the film add an experience the written post cannot create alone?
Has the Studio avoided simply illustrating every sentence literally?
Can every major film decision be traced back to the approved post?
If the approved post changes, does the system identify every affected script, frame, scene, and export?
Does changing the post require an explicit decision to update or preserve downstream assets?
Automated Audit Cycle
This checklist runs on a recurring schedule. Every gap is tracked until fixed. A production cannot advance when a P0 question returns No, Unknown, or Not checked.